Hospital Discharge Thursday.
OT Report Says House Unsafe.
We Adapt It By Wednesday.

UK Adaptations Response installs DFG-approved home adaptations when families need homes made accessible urgently. Level-access wet rooms, through-floor lifts, wheelchair ramps, stairlifts. We work with council OTs and understand Part M Building Regs.

Assessment Monday. Quote Tuesday. Install starts Friday.

Registered installers for Disabled Facilities Grants (up to £30,000 funding). We handle building control, tanking certificates, structural calcs. When someone needs to come home safely, we make it happen.

DFG Registered
Part M Compliant
Building Control Approved
🇬🇧£30k Grant Support

Home Adaptation Services

DFG-approved installations that pass building control

🚿

Level-Access Wet Rooms

Convert bathroom to wheelchair-accessible wet room. Floor lowered to create level threshold (no step). Tanked waterproofing system, non-slip tiles, wall-mounted WC, grab rails. Takes 5-7 days. Cost £6,000-9,000 (DFG covers up to £30k). Requires Building Regs approval. OT specifies grab rail positions based on individual needs.

Wheelchair Ramps & Access

Permanent ramps: 1:12 gradient max (1m rise needs 12m ramp). Modular aluminium or treated timber construction. Handrails both sides if over 2m. Takes 2-3 days. £2,000-5,000 depending on height. Portable ramps available same-day. Planning permission needed if front garden ramp visible from street.

🛗

Stairlift Installation

Straight stairlifts: £2,000-3,500, fitted in 2-4 hours. Curved stairlifts: £6,000-12,000, custom-made, 6-8 weeks lead time. Swivel seat, seatbelt, fold-away arms. Annual service required. DFG funding available if OT recommends. Battery backup works during power cuts. Weight limit typically 25 stone.

🏗️

Through-Floor Lifts

Alternative to stairlift when wheelchair user can't transfer. Shaft cut through floor/ceiling. Lift platform 900x1200mm (wheelchair size). Takes 5-7 days to install. Cost £15,000-25,000. Requires structural engineer's calcs and Building Regs approval. DFG funding covers this. Platform rated 250kg.

🚪

Doorway Widening & Thresholds

Standard door 762mm, wheelchair needs 850mm clear opening. We remove frame, widen opening, install wider door, make good. Takes 1 day per door. £800-1,200 each. Level thresholds fitted (no trip hazard). May need steel lintel if removing structure. Building control approval for structural changes.

🛏️

Downstairs Bedroom & Bathroom

Ground-floor extension or room conversion when stairs impossible. Typical 4x4m extension with bedroom + ensuite. Takes 6-10 weeks. Cost £25,000-45,000 (DFG £30k max, you pay difference). Includes foundations, tanking, electrics, heating. Planning permission + Building Regs required. OT specifies layout.

DFG Grant Support

We handle the paperwork and work with your council

£30,000
Max DFG Funding
5-7 Days
Wet Room Install
Part M
Building Regs
OT
Approved Specs

Book Adaptation Assessment

Tell us what's needed and when they're coming home